Project - Extruder System Install
PROJECT INFO
Title: Extruder System
Project: Power & Controls Installation
Location: Michigan City, IN
Discipline: Industrial Electrical Journeyman
PROJECT DETAILS
The KB team completed the required scope of work to install an electrical cabinet, power and controls for a new Extruder System for a returning customer. The crew installed new conduits and supports, the new certified cabinet, all wiring, cables and system equipment terminations for the safe operation of the Extruder System. This included all final loop checks and operational testing prior to turnover to the production department. The project was delivered on time and completed safely, with many congratulatory comments from the business owner.
